NASA Starts Installing Engines on Artemis-II Moon Rocket

Next year, NASA hopes to launch the first humans back to the moon in over 50 years. Thousands of people across the country are currently working on various flight hardware, including engineers at the agency’s Michoud Assembly Facility, who are now installing the 4 main engines of the giant SLS rocket that will help send the crew on their voyage.

Installation of the first RS-25 engine follows the joining of all five major structures that make up the 212-ft SLS core stage earlier this year, which will hold the avionics and propellants for the engines.

0E771FFA E50C 4D6C 8247 B9F39250EEE9
NASA Starts Installing Engines on Artemis-II Moon Rocket 5

Engines rich with space shuttle history

Two of the four engines for Artemis-II previously launched space shuttles, including this first one, E2059. The other two engines to be installed later will be new engines that include some previously flown hardware.

The engines are all updated and modified from their space shuttle days for the performance needed by the giant rocket. They produce more power, and are adapted to the hotter, more violent and extreme operating environment. They all have new controllers (brains), and additional insulation to protect them during the 8 minutes that they’ll be firing on launch, guzzling 1,500 gallons of fuel per second.

B71B02AE 7783 4796 ADF9 4645E2E9AED3
NASA Starts Installing Engines on Artemis-II Moon Rocket 6

Artemis-1 flew a virtually flawless uncrewed mission to the moon and back last year. They experienced some issues with hydrogen leaks in the first several countdowns, but eventually were able to fix the issue and proceed to flight. It was a dress rehearsal for Artemis-II, testing and validating everything from ground support, countdown, launch and flight and reentry.

The mission ended with a textbook splashdown of the Orion capsule off the coast of California, where the US Navy retrieved it to return to NASA.

The crew

08BA5E4C 8E3C 4A0C A065 CC721ABE6380
Official crew portrait for Artemis II, from left: NASA Astronauts Christina Koch, Victor Glover, Reid Wiseman, Canadian Space Agency Astronaut Jeremy Hansen (NASA photo)

NASA astronauts Reid Wiseman, Victor Glover, Christina Koch, and CSA (Canadian Space Agency) astronaut Jeremy Hansen are currently training for their moonshot on Artemis-II.

Glover is the mission’s pilot. He paid a visit to Michoud to witness the first engine being installed on the rocket that will send him and his crewmates to the moon.

5367DF73 F538 44DA 9414 252BDAFE0ECF
NASA Starts Installing Engines on Artemis-II Moon Rocket 7

The mission

Their mission is scheduled to last 10 days, and will be very much like Apollo 8. The crew will orbit the moon, but not land on it. Artemis-II is critical in that it will pave the way for the first landing on Artemis-III in the coming years.

NASA hopes to have all 4 main engines installed on the Artemis-II rocket within the next several weeks. The giant core stage will then eventually be prepared for shipping to Kennedy Space Center in Florida, where it will be integrated with other flight hardware and the Orion spacecraft.

Launch is slated for November 2024.

Mike Killian
Mike Killianhttps://www.facebook.com/MikeKillianPhotography/
Killian is our Assistant Editor & a full time aerospace photojournalist. He covers both spaceflight and military / civilian aviation & produces stories, original content & reporting for various media & publishers. Over the years he’s been onboard NASA's space shuttles, flown jet shoots into solar eclipses, launched off aircraft carriers, has worked with the Blue Angels & most of the air show industry, & has flown photo shoots with almost every vintage warbird that is still airworthy.

Latest Stories

Read More

Check Out These Other Stories From Avgeekery